Framing for Display

As the Visitor Center at the Quarry Gardens was taking shape, work began on the Railroad Display. I printed out the track plan for the O scale 2 rail layout full sized.

160415_102

At over 30 feet long and 10 feet deep, the Railroad Display is enormous, requiring a big pile of plans.

160416_105

I trimmed and taped the plan tiles into four large sections; one for each of the four scenes represented on the Display.

160419_224

The plans were laid out at the Visitor Center to guide the construction of the framework.

160512_52

Benchwork was built with drop sections to accommodate creeks, rivers, and a quarry.